Action Messages MRP
CarolinaC
Member Posts: 3
Hi,
I have started to work with Navision. Well in fact we are making some tests before to start.
I have run a MRP and i have get only two action messages, "new" and "cancel".
The systems says that i have to cancel one order and create a new one changing the date, but if you have already placed an order to one supplier, I don't think is logical to cancel this one and create another.
Is possible to get for example for this order "Re-schedule" instead of "Cancel".
I think the message "Cancel" is neccesary only if this item is don't really needed right now, but if the neccesary action is to advance or delay the order or maybe change the quantity the action message should be "re-schudele" or "change quantity".
Anyone knows how to get this?
Thanks
I have started to work with Navision. Well in fact we are making some tests before to start.
I have run a MRP and i have get only two action messages, "new" and "cancel".
The systems says that i have to cancel one order and create a new one changing the date, but if you have already placed an order to one supplier, I don't think is logical to cancel this one and create another.
Is possible to get for example for this order "Re-schedule" instead of "Cancel".
I think the message "Cancel" is neccesary only if this item is don't really needed right now, but if the neccesary action is to advance or delay the order or maybe change the quantity the action message should be "re-schudele" or "change quantity".
Anyone knows how to get this?
Thanks
0
Comments
-
On purchase lines there a field called Planning Flexibility
This option field indicates the flexibility of the purchase order line when the program calculates action messages.
If the field contains the option Unlimited, then the program includes the line when calculating action messages.
If the field contains the option None, then the line is firm and unchangeable, and the program does not include it when calculating action messages.0 -
As far as I understand that issue, MRP calculates demand and supply per period. If you have an order for 5 Item A in period 1, and there is no demand for it, MRP will create the cancel action message, even though there might be demand for the same item for the same quantity in the next period.0
-
Thanks both of you.
The explanation from ara3n it was so useful. I have applied this and this is what we need.
Thanks0 -
You are welcome.
0
Categories
- All Categories
- 75 General
- 75 Announcements
- 66.7K Microsoft Dynamics NAV
- 18.8K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 611 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 253 Dynamics CRM
- 103 Dynamics GP
- 6 Dynamics SL
- 1.5K Other
- 991 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 28 Design Patterns (General & Best Practices)
- Architectural Patterns
- 9 Design Patterns
- 4 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1K General Chat
- 1.6K Website
- 77 Testing
- 1.2K Download section
- 23 How Tos section
- 249 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions