Additional Charges to an Imported Item

sriram_venkat
Member Posts: 129
Hi
The situation is that i am importing a vehicle from a vendor at X Cost. But after the vehicle comes to my warehouse, i am doing value additions like repainting, fixing some additional parts etc within the warehouse using my resources (I am not subcontracting to outside vendor). I want these additional costs to go into the cost of the vehicle so that i can correctly fix my sales price. How do i do it?
Please let me know
Venkat
The situation is that i am importing a vehicle from a vendor at X Cost. But after the vehicle comes to my warehouse, i am doing value additions like repainting, fixing some additional parts etc within the warehouse using my resources (I am not subcontracting to outside vendor). I want these additional costs to go into the cost of the vehicle so that i can correctly fix my sales price. How do i do it?
Please let me know
Venkat
0
Comments
-
Load a production order for the finished goods. The BOM will consist of the unfinished car you have and any additional parts. The routing to apply teh value add parts captures the labour element.The art of teaching is clarity and the art of learning is to listen0
-
you can use the Bills of materials
You can create a new card item, from item card, item, assembly list, bills of materials.
Later, You create the components of the bills of materials (item and resource).
When you want to produce a BOM, it must be entered in and posted from a BOM journal. The program automatically makes a negative adjustment to inventory for the items that are included in the BOM and a positive adjustment for the BOM.
Best Regards0 -
If i use BOM, then i need to create 2 Vehicle codes (For the same item) right? one code during Imports and One for using in BOM and Production order. NAV threw me an error when i try to attach a BOM on which the same item code was used as a child.
Please let me know how to handle in single item code.0 -
if your item is already a bom production
you have to create a new bom production
Example
Bom 1 = Purchase item
Comp1 = additional parts 1
Comp2 = additional parts 2
You can build
Bom Production
Bom2 = Bom1 + Comp1 + Comp20 -
sriram_venkat wrote:If i use BOM, then i need to create 2 Vehicle codes (For the same item) right? one code during Imports and One for using in BOM and Production order. quote]
Wrong, irrelvant to NAV fundamentally they are not the same item, otherwise you would buy it and sell it at a markup.
By adding value you are turning the raw material into something else. This is true even if you add a label onto something.
Whether when you apply this to a system you "need" different item numbers is a different argument, but you do in my opinion.
Adding the item into its own BOM creates a circular reference, so no you cannot do this, to make one you would need one, which would mean you need to make one which means you need one . . . . . . .The art of teaching is clarity and the art of learning is to listen0 -
Hi adam
Thanks for the reply.
Assuming that my other division does this job for me and they give invoice at a later stage. Before that i had sold this item with X price. Now when i receive the Invoice from my other division, i want this cost to go into this sold item so that my profitability (For the sold item) is correct.
Is there anyway i can do it?0 -
Difficult to answer this without knowing all the inputs, however you should look at processing an item (charge) item and assigning it to the product.The art of teaching is clarity and the art of learning is to listen0
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.6K Microsoft Dynamics NAV
- 18.7K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 320 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions