How Can create rework order?
ermohdnadeem
Member Posts: 25
how can create rework order for line rejection items?
Nadeem
0
Comments
-
Are you using manufacturing? If yes, create a new production order. You create a new item being products and consume the original item.
Select the item and add the routing lines for the work you will be doing and create the output.0 -
"Are you using manufacturing? If yes, create a new production order. You create a new item being products and consume the original item."
What does this mean? I can always create a new production order directly. What do you mean by Consume the original item? Please clarify0 -
sriram_venkat wrote:"Are you using manufacturing? If yes, create a new production order. You create a new item being products and consume the original item."
What does this mean? I can always create a new production order directly. What do you mean by Consume the original item? Please clarify
Hi Rashed,
I am also looking for a similar transaction.In addition to this, some items are rejected before doing the rework and some items are used to do the rework.What to do under this situation
Waiting 4 ur reply.
Thanks0 -
Are your finished good serialized?0
-
Think of a rework order as just another production order for the same item where you define the components as itself and any additional rework parts, and the routing being whatever you do. This is the only way to process a rework order, there is nothing separate from the standard works orders to do this.The art of teaching is clarity and the art of learning is to listen0
-
Doesn't this mess up costing though? In previous versions, this would throw the adjust cost batch job into a constant loop. Was this corrected in 5.0, SP1, or 6.0?0
-
What does this mean? I can always create a new production order directly. What do you mean by Consume the original item? Please clarify
This means if the item is of no use then post a -ve adjustment and move forward and create a new production order.
Reason : u have consumed item and capacity (against ur output which is not fine) and ur expense has been booked which in any case u wont get back (it's a loss) . So u will finish the process -ve adjust it if u don't want to keep item in inventory. If it happens for partial quantity before finish of order in terms of quantity u can do the same for partial quantity but u will have +ve adjust ur consumption with apply from entry. Just reversals.
But If u want to keep rejected material, you can keep it.
But in either case u need to create a new production order to have Item produced as per ur QA standards. In next production order if u need just some corrections don't change BOM or routing on item card change it Production order line components and routing which will specify change for this "rework" production order only.
It wont put cost in any kind of loop.Kapil Khanna0 -
Generally you should change the production order status to finished when you are sure that the output of the finished goods posted is correct.(after passing quality control)
You can always post additional material consumption and work/machine center capacity and even reverse output posting on a production order until it has been set to finished.
You need to set the status of the production order to finished to have the inventory value of the finished goods transfered from the WIP account to the inventory account.
When you have the status already set to finished and after a while it turns out the the quality of the finished goods was not alright and needs a rework you can safely create another production order for the finished goods item.
Set the prod order quantity to the quantity which needs rework and start the refresh prod. order batch.
You can then change the routing lines to the routings you need for the rework if you want to post additional needed machine/work center capacity(and therfore capacity costs).
After that go to the component lines, remove them and add the finished goods item as component with most likely a quantity per of 1. (You could add additional component items for the rework process)
You can then post the prod. order using the production journal. In the production journal show the column applies-to entry. In the line for the consumption posting choose the production output item ledger entry which needs the rework.
This step makes sure that you consume the original output item ledger entry(which needed rework) and its value and transfer it to the new output item ledger entry including the additional capacity and material costs.
After that you can set the status of the prod. order to finished and you shouldn't get an error with you inventory valuation or the adjusts costs batch job.(works for 5 SP1)Karsten Frank
MCP - Dynamics NAV Developer0 -
Rework- costing works for v5 sp1.
Our consultant mentioned it was a "problem" for previous versions.0
Categories
- All Categories
- 75 General
- 75 Announcements
- 66.7K Microsoft Dynamics NAV
- 18.8K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 610 NAV Courses, Exams & Certification
- 1.9K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 250 Dynamics CRM
- 102 Dynamics GP
- 6 Dynamics SL
- 1.5K Other
- 991 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 28 Design Patterns (General & Best Practices)
- Architectural Patterns
- 9 Design Patterns
- 4 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1K General Chat
- 1.6K Website
- 77 Testing
- 1.2K Download section
- 23 How Tos section
- 249 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions