differ Components consumption for differ Location for a w/o

willsonfuwillsonfu Member Posts: 14
I want setup differ Components consumption for differ Location for a Pro.order,but Navision system only support differ components consumption for one location for a Pro.oder

Comments

  • i4tosti4tost Member Posts: 208
    Not in Navision 4.0. You can consume items from any location to your production order.
    Other way - transfer them to one (like PRODUCTION) location
  • trancutrancu Member Posts: 85
    We use Nav4.0 and we have the same problem like willsonfu.
    For manufactor an item you can only choose one location for the components.

    This Configuration has to be done on the field "Components at Location" on the "Manufactoring Setup" or "Stockkeeping Unit Card".

    But there is an other problem.
    It seems that the "Manufactoring Setup" for "Components at Location" is more dominant. So you can not have 2 different "PRODUCTION" locations.

    I already posted this problem:
    http://www.mibuso.com/forum/viewtopic.php?t=9847&highlight=

    If anyone knows a solution, plz give a short answer.
  • johnson_alonsojohnson_alonso Member Posts: 690
    For wilsonfu and others,
    I think we all have the problems with the confusing components at location in SKU, but actually, SKU states inventory and planning parameters. So, if you want to stocking and shipping from location A, then all parent items must be in location A, then component for builds the parents items will be in the same location. but if you want to produce the parent items in other location, then you must use replenishment system transfer in SKU card for component item that used to produce parent item. the system will generate PO in location A for component item and transfer order to location other that it will be used to produce the parent item.
    so that's my answer if you really want to utilise SKU.


    rgds,
Sign In or Register to comment.