How to use Job Scheduler run MPS/MRP in fixed time peroidic

chinsharonchinsharon Member Posts: 9
Dear all,

I have another problem when I want to use the Job Scheduler to define a fixed time to run MPS/MRP in each mid-night. The system cannot stop although the time has over the Shut Down Time defined.

Could I define this job to start each day by itself and stop it at one fixed point by itself, too?

Thanks advance


Chinsharon
Sign In or Register to comment.