After we fill out the purchase order and do the Ajust Cost Item Entry with Report Object ID 795, the system gives us the eror message saying "Posting Date is not within your range of allowed posting dates in Item Journal Line Journal Template Name =",Journal Batch Name=",Line No.='0'." I checked all the related tables and can't find the problem. Does anyone know it? Thanks in advance!
0
Comments
In fact it's your only option for the Adjust Costs Report.
What date are you using?
In G/L->Setup->General Ledger Setup
Are you using
Allow Posting From: & Allow Posting To: Fields?
If so is your Adjust Cost - Posting Date in between these dates?
http://www.BiloBeauty.com
http://www.autismspeaks.org
However, I can't find a Line No. 0 in the Item Journal Line table.
-a
In version 3.6 this worked without issue. Can we not do this in 4?
If there some newly evaluated older posts this error message is bound to come up.
The posting date from the request form is only used if the posting method is "Per Posting Group".
forgive my ignorance - costing is a little foreign to me.
i seem to only have the option to select "per Entry" or "Per Posting Group" on report 1002 (Post Inventory Cost to G/L). I am getting the error when running report 795 (Adjust Cost - Item Entries). In inventory set-up, we have Automatic Cost Posting = Yes.
From the help files, even with Automatic Cost Posting = yes, it is wise to run the "Adjust Cost - Item Entries" and the "Post Inventory Cost to G/L" batch jobs. By having Automatic Cost Posting = yes, does Nav 4 automatically run Post Inventory to G/L (per entry by default), even though we think we are only running 795?
Last month, we had no problems with this same process although we were still using 3.6.
All advice is greatly appreciated!
Have you tried changing the Allow Posting From: to 3/31/2006 instead of 4/1/2006?
The Adjust Cost & Post to g\l reports are not automatically run.
http://www.BiloBeauty.com
http://www.autismspeaks.org
we did not want to change the G/L setup Allow-from to keep users from posting back into March. In the past we could use the G/L Setup to handle all users, and user set-up to give extended access to the prior month to the necessary users. Since the user running 795 has 3/31/06 rights, this used to be enough. is this no longer the case?
Still, I am willing to try anything, so I will give this a shot in our test environment! Thanks.
Further advice is welcome!
any other ideas?