Why the Quantity in the Planning Worksheet is "1"

royzhroyzh Member Posts: 30
I orderd 800 pcs of item A, and made a MPS, but the MPS generated contains 800 linse, with 1 pcs per line.
Why this happen? Is there anything wrong in some setting?
Thanks

Comments

  • royzhroyzh Member Posts: 30
    Thank you
  • RongritRongrit Member Posts: 14
    I think you set field 'Maximum Order Quantity' = 1. (Item Card =>Planning Tab)
  • royzhroyzh Member Posts: 30
    Rongrit wrote:
    I think you set field 'Maximum Order Quantity' = 1. (Item Card =>Planning Tab)

    You are right dear, it is this problem. Thanks.
Sign In or Register to comment.