Hi,
I have a production order that outputs 10 of item A. Item A's BOM is one item B and one item C, so I'd need 10 Bs and Cs to produce 10 As.
All of them (components and output) require serial nos. Now, is there a way to know, which components (serial nos.) is a certain item A made of?
Basically I need something to link consumption and output. Which components were consumed in order to produce a certain one item.
Any advice apreciated,
Marko
0
Comments
RIS Plus, LLC