I'm getting below error message after switching companies multiple times in NAV 2017.
"Microsoft Dynamics NAV has run out of system resources and has been shut down. Unsaved data may have been lost."
Do you have a fancy graph on your role center page? I've noticed the graph is being loaded from a background session instead with your current RTC session. At some point the background session can crash and it will take the RTC with it. From the RTC perspective the crash can seem random because you've left the role center page already.
Do you have a fancy graph on your role center page? I've noticed the graph is being loaded from a background session instead with your current RTC session. At some point the background session can crash and it will take the RTC with it. From the RTC perspective the crash can seem random because you've left the role center page already.
Answers