New Production Item with FIFO as the Costing Method

jlyankiejlyankie Posts: 15Member
If I have created a new Item which has a Prod BOM and Routing, the costing is FIFO, can I calculate the Standard Cost to insure my costing is accurate?


  • golfergolfer Posts: 38Member
    If you are on NAV 2015 or later, you can simply choose Cost Shares Icon on the Item Card
Sign In or Register to comment.