[solved] Capacity Constrained Resource - how to setup?

RallnusRallnus Member Posts: 79
edited 2017-03-15 in NAV Three Tier
We have got an oven to heat up material in some routing task. This oven needs setup time to heat up and to cool down. Thats not a problem.
This oven has got a physical capacity which is measured in volume or in some units of loading equipment. (e.g. spindle)

Now we want to limit the capacity of this oven up to a concrete volume or a quantity os spindles.
How can we set this up?
Rallnus (Yamaha FJ1200 - '89 / 25th anniversary was great!)

Comments

  • RallnusRallnus Member Posts: 79
    The problem is, that NAV sets the routing into serial when you limit the capacity...
    Rallnus (Yamaha FJ1200 - '89 / 25th anniversary was great!)
  • RallnusRallnus Member Posts: 79
    I see the solution by using the production family. this allows you to handle several items within one routing. :)
    Rallnus (Yamaha FJ1200 - '89 / 25th anniversary was great!)