[solved] Capacity Constrained Resource - how to setup?
Rallnus
Member Posts: 79
We have got an oven to heat up material in some routing task. This oven needs setup time to heat up and to cool down. Thats not a problem.
This oven has got a physical capacity which is measured in volume or in some units of loading equipment. (e.g. spindle)
Now we want to limit the capacity of this oven up to a concrete volume or a quantity os spindles.
How can we set this up?
This oven has got a physical capacity which is measured in volume or in some units of loading equipment. (e.g. spindle)
Now we want to limit the capacity of this oven up to a concrete volume or a quantity os spindles.
How can we set this up?
Rallnus (Yamaha FJ1200 - '89 / 25th anniversary was great!)
0
Comments
-
The problem is, that NAV sets the routing into serial when you limit the capacity...Rallnus (Yamaha FJ1200 - '89 / 25th anniversary was great!)0
-
I see the solution by using the production family. this allows you to handle several items within one routing.
Rallnus (Yamaha FJ1200 - '89 / 25th anniversary was great!)0
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.7K Microsoft Dynamics NAV
- 18.8K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 328 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions