Please help me with this scenario -
I make 2 Firm Planned Production Orders with the same Due Date and use the Scheduling Direction = Back option.
When I check the Work center Load for each of the production orders, I can see that their Work centers have allocated same time/day slots for both the orders.
I change the status to Released for both orders and check the Work Center Load again. I can see that their Work centers have allocated same time/day slots for both the released orders.
Shouldn't I be getting an overlapping error or some warning like that. Is my understanding wrong?
0
Answers
https://msdn.microsoft.com/en-us/library/hh172857(v=nav.90).aspx
There's a bit more on this at the end of the following link too (explains how the "Dampner Time" field affects operating splitting)...
https://msdn.microsoft.com/en-us/library/hh997388(v=nav.90).aspx
Im giving it a look now.