Hi,
I have a firm planned production order for a top level parent item. The top level item has several levels of subassemblies and some purchased items. For example:
Top level Finished Good
-Level One Sub
-Purchased Items
- Level Two Sub
- Level Three Sub
- Level Four Sub
What I'm finding is that when I run the planning worksheet for MRP, there are only suggestions for the top level subassemblies. It appears I then have to accept the suggestions to create the production orders, then re-run MRP to get suggestions for the lower level subassemblies, that are required to complete the subassemblies one level up.
Is there any way for the planning worksheet to generate suggestions for all subassemblies levels as well as all required purchased materials all at once, as opposed to having to run iterations?
Thanks,
Steve
0
Answers
https://msdn.microsoft.com/en-us/library/hh178594(v=nav.90).aspx
...this makes sure that the items are planned in the correct order.