Change of costing method

Hi Friends

Is their a way to change the costing method in Navision 2009 SP1? I am aware of blocking the old item and creation of new item, but with 15000 items it looks very difficult.

Looking for feasible solution.

Thanks in advance

Comments

Sign In or Register to comment.