Hello,
Does anyone implement Navision (4.0) with MBS demand planner (1.1a)?
From partner source, Demand planner 1.1a (the latest) is for Navision 3.7. Is that compatible with Navision 4.0?
Beside that, the demand planner objects for importing into Navision are in Navision 3.7. Do you have these objects in Navision 4.0 ? :-k
Thanks
0
Comments
I would like to share my experience on Demand Planner with NA4.0.
So far we have tested the Demand Planner 1.1 A with Navision 4.0. The integration should work fine.
From Table 7800 -> Production forecast entry table.
Hope this helps.