Query: When to use Lead Time calculation? Located item card Replenishment tab
When to use safety lead time? Located item card planning tab.
If they fill both of the filled will navision order too much?
On the requisions worksheet sometimes if the same item shows twice and with two requision system will create two POs is there a way of rollin them up in one PO?
0