Is it possible to run code before chart part is shown?

zeonzeon Member Posts: 130
edited 2013-01-18 in NAV Three Tier
Hi,

I want to combine data from two tables as source for a chart part. Is it possible to run some code to update this combined source table before it is shown?

If not, is the alternative to setup a NAS to update the source at periodic intervals?

- zeon
Sign In or Register to comment.