How is actual Manufacturing Overhead calculated?

g8trjasonb
Member Posts: 5
Navision 5.0.

I'm trying to understand how the actual Mfg OH of 387.33 was determined, along with expected Mfg OH of 395.84. Also, is the standard cost for Mfg OH calculated?
Thanks
I'm trying to understand how the actual Mfg OH of 387.33 was determined, along with expected Mfg OH of 395.84. Also, is the standard cost for Mfg OH calculated?
Thanks
0
Comments
-
Manufacturing Overheads are indirect material cost, indirect labour cost or other expense incurred while making a certain product. This cost is added in item cost. In navision manufacturing overheads are calculated from Overhead rate defined on item card or Indirect cost% defined on item card.
The difference in Manufacturing overhead Expected cost and actual exist because your expected material cost and actual material cost is different.
Kindly check ur Item card , Indirect cost % must have been defined.
Example- If Indirect cost % on Item is 10%
Material cost(expected ) -- 1000 Then
Manufacturing overhead (Expected) 100
Material cost(actual ) -- 800 Then
Manufacturing overhead (actual) 80
I hope i answered your query.
____________________________
Regards,
Faisal Bukhari.0 -
Makes sense. Thanks0
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.6K Microsoft Dynamics NAV
- 18.7K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 320 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions