Have a simple scenario as follows:
Production Location - Location A
Component Location - Location A and/or Location B
Is there a way to configure the system so that Planning will check both Location A and Location B for components? I know I can use the 'Components at Location' field on the SKU record to direct to one location but cannot direct to multiple (only need 2) locations.
I don't think it is unreasonable to have components held both at the manufacturing location and at a raw materials warehouse / location.... :-k