how to maintain dimention value of item in RPO

pravin_mpravin_m Member Posts: 67
hello everybody

I am using NAV2009R2. when we made Realese Production Order of Item x which Raw Material is item A (maintained in BOM). item x dim. = assy item A dim. = raw. now when we made consumption journal then system select the dim. in Item A = assy.

so how can carry the dim. of item A in item A.

Thanks in advance

Regard
Pravin Maheshwari
Sign In or Register to comment.