Job Task Dimensions Default

dahlia94040dahlia94040 Member Posts: 33
I assigned default job task dimensions but when I enter a job G/L journal it doesn't seem to populate the line with the default task dimensions. I found an old post (2005 with a 2007 reply) which mentions the same problem but no one every responded with an answer. Does anyone know if this is a bug? Or was it not really meant to be setup to be able to use the dim. functionality like the rest of NAV?

I'm testing this in NAV 2009 SP1.
Sign In or Register to comment.