The scenario is -
i've produced a material in a Jan-11 month against multiple production order. The Direct cost is 15 Rs. and overhead cost 6 Rs.. Toal cost - 21
After the month we realized that the actual overhead cost is 20000/- whether in system the defined overhead cost is 15000/- (as per produced material)
how did i load this additional 5000 Rs. on material produced in a month.
please suggest.
Regards,
Jai Verma