I have a question regarding released production orders
If a production order is released and is in the middle of production. For some reason the production line experiences a downtime
(due to a part failure). How can the production order be updated to reflect the actual end time.
For example if the routing for an item is set up in such a way that that the desired quantity takes 2 days. The line experiences a downtime because of which the production order takes 4 days. How can I update the production order to reflect this delay?
0
Comments
system will restrict refresh, to reflect revised end time.
you can use 'Stop Code' & 'Stop Time' in output journal to capture the downtime data.
Now i did try creating an absence. But on running the planning functionality. The system schedules a production order to run in that time slot where an absence was registered. Is there any other set up that has to be done to prevent an order from being scheduled in that time slot when an absence has been registered.
1. Reg. Abs (m/c or w/c)
2. check at Registered Absence
3. Implement Redg Abs
4. Recalculate calendar to update Capacity (effective).
Cheers..