What is the difference between line type (Production) and (Item) in BOM Line ? As I noticed I can have both treated as Semi finished good. I went through Production pdf many times but could not understand it exactly, neither any example has been given.
0
Answers
Yes both can be treated as semi finished goods.
The main purpose of the Line Type Production is, that the system will create a new production order for the Line Type of Production - if this is of BOM Item Type.
Suppose you have a BOM which includes the Sub BOM in the BOM lines and if you want to generate a new production order for that (the Sub BOM) - you need define it as Line Type - Production in the BOM Lines.
If you do not mind could you explain with an example when and how I could use type "Phantom" :? . Thanks in advance for your help .
Phantom BOM is a non stock item - which is used for calculating the requirements.
and it will be considered into inventory only when this is actually required for manufacturing.
This is a theoretical explanation - not used it practically