There are items in our Nav 3.60 database which don't appear to be reporting the correct rolled-up capacity cost and I can't figure out why.
If I work it out manually, or run the Detailed Calculation report (99000756), the cost on the routing comes back as 1.24. However, the item card says 1.20858. I know the difference is fairly small, but the cost on the item card is still wrong and I'd like to know what is causing the discrepancy.
If anyone has any ideas about where to look I would appreciate it!
Gary.
EDIT: Noticed something on the detailed calc. report: Cost Time. The value in this field is the difference between the rolled-up capacity cost on the item card and the total cost on this report. So, next question - where does the Cost Time come from?