I have 10 widgets in location BLUE as of 1/1/09 (these widget are made from a BOM which = 1000 pieces of item 10000)
I have a forecast that says I have demand of 100 widgets from location BLUE in 10/1/09
If I do planning for September, I would like te system to suggest that I make 90 widgets (100 i need - 10 I have)
When I run the planning, it suggests I make 100.
Is there something else I need to do to include looking at this existing inventory? Isn't this how the planning works (from what I have read)?
I am planning 10/1/09 ..10/31/09.
Both check boxes are checked.
I have selected the correct forecast.
Any help would be greatly appreciated. Thank you.
I have a forecast that says I have demand of 100 widgets from location BLUE in 10/1/09
If I do planning for September, I would like te system to suggest that I make 90 widgets (100 i need - 10 I have)
When I run the planning, it suggests I make 100.
Is there something else I need to do to include looking at this existing inventory? Isn't this how the planning works (from what I have read)?
I am planning 10/1/09 ..10/31/09.
Both check boxes are checked.
I have selected the correct forecast.
Any help would be greatly appreciated. Thank you.
0
Comments
-
You would need to tell us how your item is setupThe art of teaching is clarity and the art of learning is to listen0
-
Fair enough:
The item has SKUs set up per location.
Replenishment system: Production Order
Manufacturing Policy: Make to Stock
I have a BOM and Routing set up
Flushing Method: Manual
Reordering Policy: I have tried them all, but I have Order set up
That is all.
Is there a particular set-up that needs to be done in order to include the available inventory (by location) in the planning?0 -
Also - when I tried useing Reorder Policy Lot For Lot, I did ensure Include Inventory was checked on both the Item and the SKU card.0
-
eagle_eye wrote:Fair enough:
The item has SKUs set up per location.
Replenishment system: Production Order
Manufacturing Policy: Make to Stock
I have a BOM and Routing set up
Flushing Method: Manual
Reordering Policy: I have tried them all, but I have Order set up
That is all.
Is there a particular set-up that needs to be done in order to include the available inventory (by location) in the planning?
If u r using SKU then all this shud be on SKU have u done so. :?:Kapil Khanna0 -
Well if it is set to order then it is working as you want it.
Is the production forecast entered by location?
You are selecting your forecast on the planning run?
You have no exclusion dates set on the plan?
You have no filters set on the plan?The art of teaching is clarity and the art of learning is to listen0
Categories
- All Categories
- 75 General
- 75 Announcements
- 66.7K Microsoft Dynamics NAV
- 18.8K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 610 NAV Courses, Exams & Certification
- 1.9K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 251 Dynamics CRM
- 103 Dynamics GP
- 6 Dynamics SL
- 1.5K Other
- 991 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 28 Design Patterns (General & Best Practices)
- Architectural Patterns
- 9 Design Patterns
- 4 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1K General Chat
- 1.6K Website
- 77 Testing
- 1.2K Download section
- 23 How Tos section
- 249 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions