Fixed Routing Run Time for An operation in NM2.60

kkmobile
Member Posts: 2
Hello everyone,
Can anybody suggest how do we fix an operation time on the routing lines per operation irrespective of the output we are producing.
also is it possible to set up run time for an operation on the basis of Input rather than the output.
Thanks
karthik
Kartikeya Pasumarti
Karthik@datahelp.com
+520 290 8870
Can anybody suggest how do we fix an operation time on the routing lines per operation irrespective of the output we are producing.
also is it possible to set up run time for an operation on the basis of Input rather than the output.
Thanks
karthik
Kartikeya Pasumarti
Karthik@datahelp.com
+520 290 8870
0
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.6K Microsoft Dynamics NAV
- 18.7K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 320 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions