I have setup a BOM with several sub-assemblies. For one of the sub-assemblies, we need to assign serial numbers to the output journal. This sub-assembly is tied to an inventory item that has serial number tracking turned on. The item is linked backed to the same BOM and Routing. Why would I get this message when trying to assign serial numbers to the output journal for the production step. Thanks for the help. Angela
0
Comments
The master BOM has three lines
1. Item - Actual Component
2. Production BOM - Phantom BOM made up of two components
3. Item - the Sub-assembly that is tied to the item. (Also has lower level Phantom BOMs and component inventory items)
When I run the planning worksheet, it creates two production orders. One for the master BOM and one for the 3rd line or sub-assembly tied to a serial number item tracking item. When I tried to do an output journal against the production order created for this item, I get that message.
Thanks for the help. Angela
Is the message exactly as you state - related to an operation number?
Can you manually raise one for the sub-assembly and post an output journal (eliminates any issue related upstream or to planning).
What are the serial number settings for the code on the item tracking card?
It does however show the item construction at the sub-assembly level is fine, although it seems how it is used is not.
Can you confirm the output you have hte message with is for the sub-assembly, and not the parent? I presume all flushing is set to manual on the BOM?
What version is this?
Any modifications in this area?
No PM,please use the forum. || May the <SOLVED>-attribute be in your title!