batches updates - due to connectivity problem with locations

PrajeeshPrajeesh Member Posts: 15
Hi,

We are having problem in getting connected with our factory location to use navision at real time. Due to the location were the factory is situated which is in valley were we failed to use microwave antennas. So i would like to know from any of the friends that is there any other way to update the entries made at the locations in batches in every one or two hours by emailing the batches to the head office or using web base interface.

Prajeesh

Comments

  • ara3nara3n Member Posts: 9,256
    Ask them to write the info into excel and email it to Head Office.
    In Head Office somebody can import the excel file. Write an import modification and allow the user in Head Office to post the transactions.
    Ahmed Rashed Amini
    Independent Consultant/Developer


    blog: https://dynamicsuser.net/nav/b/ara3n
Sign In or Register to comment.