adjust cost - GL posting set-up
pashya1972
Member Posts: 176
Hi
If I set user set-up 01/03/09 to 31/3/09 and in GL set-up same i.e. from 1/3/09. then system does not allow to run adjust cost batch. But I need to ensure that no backdated posting i.e. prior to 1/3/09 shd be done in GL.
What is the remedy? Is there any other set-up?
Prashant
If I set user set-up 01/03/09 to 31/3/09 and in GL set-up same i.e. from 1/3/09. then system does not allow to run adjust cost batch. But I need to ensure that no backdated posting i.e. prior to 1/3/09 shd be done in GL.
What is the remedy? Is there any other set-up?
Prashant
0
Comments
-
Fill "Closed Period Entry Posting Date" with a date which is allowed for the user and run the batch job.CA Sandeep Singla
http://ssdynamics.co.in0
Categories
- All Categories
- 75 General
- 75 Announcements
- 66.7K Microsoft Dynamics NAV
- 18.8K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 611 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 253 Dynamics CRM
- 103 Dynamics GP
- 6 Dynamics SL
- 1.5K Other
- 991 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 28 Design Patterns (General & Best Practices)
- Architectural Patterns
- 9 Design Patterns
- 4 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1K General Chat
- 1.6K Website
- 77 Testing
- 1.2K Download section
- 23 How Tos section
- 249 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions