How to receive from a Subcontract???

xina_man
Member Posts: 116
Hi there!
I've been searching in the forum how to receive items from a subcontract but, I did not find one way that i can use.
When I try to create a warehouse receipt for the subcontract, it shows a message "There are no Warehouse Receipt Lines created.".
If I try to receive it from the purchase line the message shown is "Warehouse Receive is required for Line No. = xxxx".
Can anyone tell me which is the correct way to receive items from subcontracts?
If the subcontract is the last operation in the routing, must i post it in output journal or must i receive it first?
Thanks in advance!
I've been searching in the forum how to receive items from a subcontract but, I did not find one way that i can use.
When I try to create a warehouse receipt for the subcontract, it shows a message "There are no Warehouse Receipt Lines created.".
If I try to receive it from the purchase line the message shown is "Warehouse Receive is required for Line No. = xxxx".
Can anyone tell me which is the correct way to receive items from subcontracts?
If the subcontract is the last operation in the routing, must i post it in output journal or must i receive it first?
Thanks in advance!
0
Comments
-
Just uncheck the receipt required from the location card and than receive the material from purchase line if you are not using pick or put away functionality.Mukesh Sharma0
-
That is the problem...
I can't uncheck that field because we are using those functionalitys.
Now I'm changing the CU's to insert missing data into the purchase line, like Qty per Unit of Measure and Qty(Base), and it seems to be working now.
Thanks0 -
Hi,
I get a similar case as yours. I am also thinking if any warehouse receipt can be created so that I can have document for in-stock and complete the payment. Up to now, I only find 1 way to solve this problem.
I enter the Quantity received on the PO. Although the message appears (due to the warehouse setup to require receive), I ignore it. And post the receive on PO. It will post Capacity Ledger entries with expected output.
Hope this can help in your case, though I don't think this is the best solution. I am still looking for a receipt with warehouse activity.0 -
In sub-contracting you purchase a "service". This is not an item and therefore cannot partake in the WMS processing. My memory tells me that sub-contracting and WMS never really met, but I am sure there are other posts on here relating to that.The art of teaching is clarity and the art of learning is to listen0
-
I agree that subcontracting is a purchase of service, but I think in most cases, we do send something out for service. In manufacturing we always send inventory to subcontractor for additional processing and we receive as the service completes. I may treat the warehouse picking as sending out. But no means to handle the return to warehouse. For our case, we prefer a return to warehouse, QC and then consume.0
-
Hi all, i believe there's a code fix for this. try to contact your partner for it.0
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.6K Microsoft Dynamics NAV
- 18.7K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 320 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions