Planned Production Order -Manufacturing

ramyavenkat
Member Posts: 94
Manufacturing queries
1. while creating a planned production order, the due date field in the header is mandatory. what is the process of forward scheduling the job,with a starting date and no end date?
2. Also when scheduling,the system auto calculates the dates taking into account 100% of the machine load . is there any way by which we can have a distributed load over a time period?
3. how can i distinguish similar machines with different efficiencies, within a machine center with the same routing operation?
REGARDS
Ramya V
1. while creating a planned production order, the due date field in the header is mandatory. what is the process of forward scheduling the job,with a starting date and no end date?
2. Also when scheduling,the system auto calculates the dates taking into account 100% of the machine load . is there any way by which we can have a distributed load over a time period?
3. how can i distinguish similar machines with different efficiencies, within a machine center with the same routing operation?
REGARDS
Ramya V
0
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.6K Microsoft Dynamics NAV
- 18.7K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 320 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions