Hi ,
I created a item Pen ..
Unit of measures are Pcs, Box = 20
Base UOM = PCS.
I created a purchased order for Item Pen
Qty = 5 UOM = BOX.( That means i have to receive 5 * 20 = 100)_
I received 5 Boxes , But each box contain 19.
That means i received 95.
So how to dothis In navision ?
Even i try to enter in Qty( Base) field, qty to receive (base ) field.
But system throw some error "
Qty to Unit of measure Must be always 1 "
So how to do this innavision ?
Please suggest me.
hansika
0
Comments
http://ssdynamics.co.in
I have to receive in BOXES.
But Boxes does not have proper qty which i defined in Unit of measure table.
That means 1 Box = 20 ( so 5 boxes has 100)
But now i receved 5 Boxes( but 95, that means each Box contain only 19)
So how to do this?
Code : Box19
Qty. per Unit of measure : 19
http://ssdynamics.co.in
As stated above you cannot use BOX as your UOM since you defined BOX already as 20.
for 19 you'll need to create a new UOM (unless the box amount will ALWAYS be 19)
But i'm assuming it was a error in packing.
Personally I would change the UOM to PCS and receive the 95. Then contact the Manufacturer to send another 5.
then add the 5 pcs to the po & receive that so it would be complete.
http://www.BiloBeauty.com
http://www.autismspeaks.org