Analysis by dimension does not tie to G/L entries..

dverghesedverghese Member Posts: 8
We are on NAV 4.0. Periodically the Analysis by dimension gets out of sync with the G/L Entries. At times it skips entries or the dimension values have changed after the anlayis view update has run. As a result they are not in sync. The only option at this point is to change one of the fields on the analysis view card which causes all the analysis view entries to be deleted. Then reset the field to the original value and then rerun update (which does the update from the begining i.e. from very first entry). This keeps on happening periodically. Saw a blog which stated it was a concurrency bug. I concur with that. Running the Analysis view update on a monthly basis is not a viable option. Is there are Navision code (permanent) fix for this?

Thanks,
Dennis.

Comments

  • ayhan06ayhan06 Member Posts: 210
    dverghese wrote:
    At times it skips entries or the dimension values have changed after the anlayis view update has run. As a result they are not in sync.

    How does this occur? do you mean "Change Global Dimension batch job" or something else?
Sign In or Register to comment.