Standard capacity cost for a production order

srvaidya.63srvaidya.63 Member Posts: 21
Hi All,

If my items do not have STANDARD as costing method, shall I get Standard capacity & Material costs on Production order staistics screen (F9) or not?

Regards,
S.R.Vaidya.

Comments

  • AdamRoueAdamRoue Member Posts: 1,283
    You will get standard material costs if your production item has a stadnard cost, even if the costing method is not standard.

    The capacity depends upon the unit cost of the work centre, to see this in the standard cost you would need to have rolled it into the standard cost calculation. On the item you have this option, it would then roll up the materials and routing and be able to split this out for you on this screen.
    The art of teaching is clarity and the art of learning is to listen
Sign In or Register to comment.