Quality specification!!!

santoshmkcetsantoshmkcet Member Posts: 229
In item master -Quality tab we have 2 fields - Spec ID & WIP Spec ID.

Is Spec ID for quality check for the item
& WIP Spec ID quality check for its WIP item.

Dont have the manual for that, so if you can help me in this....



Santosh
Thanks & Regards
Santosh
Where Stones can be transformed to Gold

Answers

  • DeepDeep Member Posts: 569
    The tab you are talking about is not a default one and hence no default manuals would be available.

    Try testing the functionality.
    Regards,

    Deep
    India
  • santoshmkcetsantoshmkcet Member Posts: 229
    Sorry folk, the "manual" I was talking was reading manual, which is not present to go through the reading manual.

    I am testing the functionality but got stuck with the following:

    In item master - Quality tab we have 2 fields - Spec ID & WIP Spec ID.

    Is Spec ID for quality check for the item
    & WIP Spec ID quality check for its WIP item? :-k
    Thanks & Regards
    Santosh
    Where Stones can be transformed to Gold
  • thinafansthinafans Member Posts: 88
    HI SANTHOSH,

    Spec id for purchase item.

    WIP ID for Semi finish ite.

    Suppose if you tag in the WIP Id,you have to create the sub assembly code and the sub assembly code should tag in the routing line.

    Suppose if you tag in the routing line but you are not taged in the item card,then there won't be any reflection while posting the output journal.

    Regards,

    THINA.
  • santoshmkcetsantoshmkcet Member Posts: 229
    thinafans wrote:

    Spec id for purchase item.

    WIP ID for Semi finish ite.

    Thank you Thina for clearing my doubt.

    Now I am facing a problem in a situation....

    Requirement 1:
    After consuming RM I have to produce WIP.After that I have to quality check the WIP.

    What I have done:
    I created spec A, tagged it in routing & item of WIP ( In WIP Spec ID )

    Problem:
    After posting the outout journal, when WIP is under inspection, at that when we see the item master of WIP , the system is not showing that WIP is under inspection in the inventory.

    Tell me where I have gone wrong in setting up the setup?

    Requirement 2:
    There ia another quality check for WIP before converting into FG in inventory.

    Problem:
    Now if we creat a Spec B, include in the routing of FG, what I need is the WIP item master should show item is under inspection in inventory. ](*,)

    I think this has to be customised by adding one more field in the quality tab of the item master, showing "WIP 2 SPEC ID " like that.

    If you have any other idea please bring forward..... O:)
    Thanks & Regards
    Santosh
    Where Stones can be transformed to Gold
  • thinafansthinafans Member Posts: 88
    Solution for Problem No:1

    For the WIP items we can't able to see the Status in the item card same as Purchase.
    For the WIP we can see the status in the Production order Routing line.
    There will be field Quantity send for Quality.

    From the Routing line you can create the Report.

    Solution for Problem No:2

    After Posting the inspection Receipt for the first routing line,you can able to generate the another inspection data sheet for the same WIP item without taging the wip id in the Item card.

    Regards,

    THINA.
  • santoshmkcetsantoshmkcet Member Posts: 229
    thinafans wrote:
    Solution for Problem No:1

    For the WIP items we can't able to see the Status in the item card same as Purchase.
    For the WIP we can see the status in the Production order Routing line.
    There will be field Quantity send for Quality.

    From the Routing line you can create the Report.

    Thanks a lot for your information!!!

    But if I need the status to be shown in item master we have to customise isn't? :-k


    thinafans wrote:
    Solution for Problem No:2

    After Posting the inspection Receipt for the first routing line,you can able to generate the another inspection data sheet for the same WIP item without taging the wip id in the Item card.

    Regards,

    THINA.

    I think this is not possible because the situation is that if I had to check the WIP with 2 different quality specification then you cannot make it happen. Here also a customisation needed!!! :-k
    Thanks & Regards
    Santosh
    Where Stones can be transformed to Gold
  • santoshmkcetsantoshmkcet Member Posts: 229
    In Production Order - Functions - Create Inspection sheets cannot be utilised as an error appears Quantity send to Quality must not be 0 in Production Order Line.

    Yes that is absolutely correct!!!!!

    But when you go to Line - Routing, we can see Quantity send to Quality.



    So some setup might have been missed, isn't it?

    Please help me in this!!!
    Thanks & Regards
    Santosh
    Where Stones can be transformed to Gold
  • santoshmkcetsantoshmkcet Member Posts: 229
    The requirement has to be customised!!!!
    Thanks & Regards
    Santosh
    Where Stones can be transformed to Gold
Sign In or Register to comment.