Standard Item costing method

grofsgrofs Member Posts: 53
Hy all,

I have a question about item costing method!

I need information about what is or what are the tumbler with item costing method: standard!?

pleas, help me!

Comments

  • slmaluwaslmaluwa Member Posts: 366
    sorry, can you please rephrase your question?
    On the other hand, costing method is typically chosen by the company finance guys based on the type or requirments of the company.
    Many choose Average, AFAIK
    "A bove maiore discit arare minor"-"From the old ox, the young one learns to plow."
  • Alex_ChowAlex_Chow Member Posts: 5,063
    "Your choice of costing method determines the way that the program calculates unit cost by making assumptions about the flow of physical items through your company. "

    Push F1 on the Costing Method field to get indepth explaination.
  • thinafansthinafans Member Posts: 88
    If you choose costing method as standard,Then you will get the variance against the standard cost.

    System will arrive the Standard cost based on the routings and Production BOM.

    We have to define the Variance account in Inventory Posting Setup.

    If you Consume more than the Production BOM qty,It will go to Material Variance Account.

    If you Utilize the workcenter or Machine center more than routing time,It will go to Capacity Variance.

    This is basic Functionality of Standard costing method.

    Regards,

    THINA.
Sign In or Register to comment.