date constant for calcdate

satanbis2
Member Posts: 24
Hello,
I use nav 4.0 SP3 BE
My pc is with regional settings belgium
To use a calcdate, with the client, I must write CALCDATE('+7J',mydate)
To have mydate + 7 days.
Now, I want to run the same things with navision application server.
But I recevie an erroe, the date constatt is incorrect, It must be '+7D'.
The client want it in frnech, and NAS in english.
So difficult to use the same CU, report, ...
NAS and client runs on my pc.
Is it possible to force the NAS to use calcdate with french constant ?
Thx
I use nav 4.0 SP3 BE
My pc is with regional settings belgium
To use a calcdate, with the client, I must write CALCDATE('+7J',mydate)
To have mydate + 7 days.
Now, I want to run the same things with navision application server.
But I recevie an erroe, the date constatt is incorrect, It must be '+7D'.
The client want it in frnech, and NAS in english.
So difficult to use the same CU, report, ...
NAS and client runs on my pc.
Is it possible to force the NAS to use calcdate with french constant ?
Thx
0
Comments
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.6K Microsoft Dynamics NAV
- 18.7K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 320 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions