Hi NAV-Masters!
I am upgrading a 3.70 native database to 5.00 SQL.
The first step was the Migrate-Process. Running Codeunit 104015 (Field Check), found more than 18.000 Date-Errors in the system (e.g. 0098 instead of 98).
Does anybody know a solution for this problem, because a manually correction is a very hard job.
Thanks for help!
davidoff
0
Comments
The date is wrong anyway and as long as the G/L balances out everything should be fine.
Has anyone gone to the effort of modifying the routine so that it actually creates dates that make sense? And want to share it? For example assume that bad dates are supposed to be in the 1959 to 2058 range or something like that?