Rounding for qty item required in planning worksheet

kennyhohkennyhoh Member Posts: 10
Assume that item, Tube (part of Bicycle) have 2 UOM
PCS 1
BOX 15 (set as purchase UOM)

means 1 box consist of 15 pcs and have 0 in inventory

In the BOM, producing each bicycle required 2 units of tube. After executing the planning worksheet to build 20 bicycles , the system suggest me to purchase 2.6666 boxes of tubes. is there anyway to make the system to round up purchase UOM? in this example, system should suggest buy 3 boxes instead 2.6666 boxes?

Answers

Sign In or Register to comment.