Fixed Cost in a Routing

SuperSage77SuperSage77 Member Posts: 101
Hi,

I shall want to use a fixed cost in a routing,about the batch size.
Can I use the "Setup Time" in a routing and how calculate le standard cost with this process in a Prod.Order ?



Thanks for any solution !!!!

Comments

  • flfl Member Posts: 184
    Yes you might do that, BUT be aware that adding setup time will also increase the load on the machine/workcenter, and this might be not your intention.
    Francois
    Consultant-Developper

    http://www.CreaChain.com
Sign In or Register to comment.