MRP Qty. Calc. for items for which POs with partial receipts

s_venkatesh78s_venkatesh78 Member Posts: 97
Hi,

I noticed that if I have a PO line which is partially received, while running the MRP Navision ignores this line also. Ex., Raw material Item A requirement is 1000 / PO line – 250 / Received – 50 / Outstanding to receive – 200/

Qty suggested while running MRP is = 1000 – 50 = 950 / System is not considering the outstanding Qty to receive ie., 200

Is that any set up I am missing ? Any solution for this ?
Thanks and Regards,
Venkatesh

Comments

  • AdamRoueAdamRoue Member Posts: 1,283
    Hi

    I believe this was a known bug in early versions of 4 (?) I suggest you put this back to your reseller, or check with Microsoft. I am 90% sure a hotfix was issued for this.
    The art of teaching is clarity and the art of learning is to listen
  • ayhan06ayhan06 Member Posts: 210
    check for dates.. expected receipt date of po line may not be suitable for date of requirement..