BOM for raw material

milindmilind Member Posts: 130
Hi
Is it possible to use the same item on its BOM,if yes how it can be done.
I am using NAV4 sp3.
My problem is that, I get steel bar as raw material which after carrying
out certain process will be sold as steel bar as finished goods.

Thanks in advance
Milind

Comments

  • DeepDeep Member Posts: 569
    As the form of item changes, there must be two items.
    You use one as a raw material for the other one (FG).

    If the processes carried over the item are external, then it is possible through subcontracting.
    Regards,

    Deep
    India
  • mukshamuksha Member Posts: 274
    You should make it as different item as you have done the value addition to the steel bar purchased.
    Mukesh Sharma