BOM for raw material

milind
Member Posts: 130
Hi
Is it possible to use the same item on its BOM,if yes how it can be done.
I am using NAV4 sp3.
My problem is that, I get steel bar as raw material which after carrying
out certain process will be sold as steel bar as finished goods.
Thanks in advance
Milind
Is it possible to use the same item on its BOM,if yes how it can be done.
I am using NAV4 sp3.
My problem is that, I get steel bar as raw material which after carrying
out certain process will be sold as steel bar as finished goods.
Thanks in advance
Milind
0
Comments
-
As the form of item changes, there must be two items.
You use one as a raw material for the other one (FG).
If the processes carried over the item are external, then it is possible through subcontracting.Regards,
Deep
India0 -
You should make it as different item as you have done the value addition to the steel bar purchased.Mukesh Sharma0
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.6K Microsoft Dynamics NAV
- 18.7K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 320 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions