Hi
Is it possible to use the same item on its BOM,if yes how it can be done.
I am using NAV4 sp3.
My problem is that, I get steel bar as raw material which after carrying
out certain process will be sold as steel bar as finished goods.
Thanks in advance
Milind
0
Comments
You use one as a raw material for the other one (FG).
If the processes carried over the item are external, then it is possible through subcontracting.
Deep
India