Re-Work in production module

ranganath.kakarlaranganath.kakarla Member Posts: 13
edited 2007-07-16 in Dynamics AX
Hi all
Can any one help me how to set rework or how I can show the rework
concept
This is the case I am having 6 operations in this I had the problem on
4th operation and the operation 5th I cannot proceed for this item and
this item should be done re work
When Prod. Manager checks the status he should identify how many rework
operations had done so that he can take corrective action.
How can I do this type of cases can any one help me

Thanks in advance
Ranganath.k
Sign In or Register to comment.