creating item variants and prod. order estimation & cost

Andreas_Gunawan
Member Posts: 64
Dear all,
I am confusing setting item variants in AX item table, for example :
item A is a finished good
produced in the type like as follows :
1. weight 300 gram / pieces item A
2. weight 250 gram / pieces item A
3. vol. 120 ml / pieces item A
4. vol. 250 ml / peices item A
so, the item A will be produced in many type of variants but contains the same BOM/ingredients.
How to set the items in the item table ? do I have to create item A-1, item A-2, item A-3 and item A-4 ?
How the production order created because the routing will be batch flow shop and the finishing machines will be splitted after mixing operation finished ?
[-o< [-o<
I really appreciate your answer so much. tks in advance
Rgds,
Andreas
I am confusing setting item variants in AX item table, for example :
item A is a finished good
produced in the type like as follows :
1. weight 300 gram / pieces item A
2. weight 250 gram / pieces item A
3. vol. 120 ml / pieces item A
4. vol. 250 ml / peices item A
so, the item A will be produced in many type of variants but contains the same BOM/ingredients.
How to set the items in the item table ? do I have to create item A-1, item A-2, item A-3 and item A-4 ?
How the production order created because the routing will be batch flow shop and the finishing machines will be splitted after mixing operation finished ?
[-o< [-o<
I really appreciate your answer so much. tks in advance
Rgds,
Andreas
0
Comments
-
Andreas Gunawan wrote:Dear all,
I am confusing setting item variants in AX item table, for example :
item A is a finished good
produced in the type like as follows :
1. weight 300 gram / pieces item A
2. weight 250 gram / pieces item A
3. vol. 120 ml / pieces item A
4. vol. 250 ml / peices item A
so, the item A will be produced in many type of variants but contains the same BOM/ingredients.
How to set the items in the item table ? do I have to create item A-1, item A-2, item A-3 and item A-4 ?
How the production order created because the routing will be batch flow shop and the finishing machines will be splitted after mixing operation finished ?
[-o< [-o<
I really appreciate your answer so much. tks in advance
Rgds,
Andreas
Hi,
I assume all the 4 cases using exactly the same BOM line item?
What are the things that determine if Finished Good A needs for example, version 1 instead of version 4? Is it decided by customer or what?
Is there any unit conversion between gram and ml?
Can u use BOM version?
Do you use master planning? What is the requirements of item A looks like?Error in Brain/SignatureWrite/run line 0
Wrong parameters :P0 -
Dear hardi,
quote]I assume all the 4 cases using exactly the same BOM line item?
What are the things that determine if Finished Good A needs for example, version 1 instead of version 4? Is it decided by customer or what?
Is there any unit conversion between gram and ml?
Can u use BOM version?
Do you use master planning? What is the requirements of item A looks like?
[/quote]
1. Yes, u r right
2. It is decided by customer request and also packing material size spec.
3. Will the BOM version be helpful for me ? Is it really accommodate to my problem ?
4. The problem is that we want to use master planning. The item A is a finish good but will be sell in different packed material size.
Rgds,0
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.6K Microsoft Dynamics NAV
- 18.7K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 320 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions