the effect of creation of 2 same item

Andreas_Gunawan
Member Posts: 64
Dear All,
I am currently confusing when I find that a friend using AX create two the same item but one only use routing untill middle process/operation then end. The items purposes are finish good and WIP. item A-1 called WIP contains 4 operations routing (e.g. A-B-C-D), meanwhile item A contaims 4 operations in routing (e.g. E-F-G-H). item A actually must follow operation sequences A-B-C-D-E-F-G-H whenever I must calculate the estimation cost of its production, mustn't it ? but my friend didn't created the routing for item A, but divided. meanwhile WIP can't be sold but it is only finish good. my questions are as follows:
1. Does AX have field or functionality or anything else that can be combined the WIP cost + finish good cost based on the routing or whenever the production is set to end ?
2. if I want to know item A cost (estimation) , will it be included item A-1 automatically whether I do estimation on item A-1 or not ? The both items of course used the same BOM but only different routing.
Anyway, if I use the both routing on item A (2 versions maybe, I am not sure), does AX use the both routing in the estimation ? I wish to have the answer from you. I appreciate it so much. tks
Rgds,
I am currently confusing when I find that a friend using AX create two the same item but one only use routing untill middle process/operation then end. The items purposes are finish good and WIP. item A-1 called WIP contains 4 operations routing (e.g. A-B-C-D), meanwhile item A contaims 4 operations in routing (e.g. E-F-G-H). item A actually must follow operation sequences A-B-C-D-E-F-G-H whenever I must calculate the estimation cost of its production, mustn't it ? but my friend didn't created the routing for item A, but divided. meanwhile WIP can't be sold but it is only finish good. my questions are as follows:
1. Does AX have field or functionality or anything else that can be combined the WIP cost + finish good cost based on the routing or whenever the production is set to end ?
2. if I want to know item A cost (estimation) , will it be included item A-1 automatically whether I do estimation on item A-1 or not ? The both items of course used the same BOM but only different routing.
Anyway, if I use the both routing on item A (2 versions maybe, I am not sure), does AX use the both routing in the estimation ? I wish to have the answer from you. I appreciate it so much. tks
Rgds,
0
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.6K Microsoft Dynamics NAV
- 18.7K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 320 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions