[RESOLVED] Production Schedule (version 4.01)

edmastoedmasto Member Posts: 15
Hi:

When I attempt to open the Production Schedule window from Nvaision, I keep getting the following error "Error showing schedule data on the Production Schedule."

I'm fairly certain the setup is correct:

Starting Date: -1D
Ending Date: 1M
Progress Calculation: Based on time

Does anyone have any ideas???

Ed

Comments

  • johnson_alonsojohnson_alonso Member Posts: 690
    This problem I face oftentimes several times ago. The causes classified as follows:
    1. Your must check your machine/work center planning calendar, it must match with production schedule setup
    2. Your routing sequence (serial or paralel), run time, concurrent capacity, lotsize.
    3. When you install Navision, you must include the exe file :
    NavisionGanttServer.exe.
    :wink:


    G'Luck,

    Rgds,
    Johnson
  • edmastoedmasto Member Posts: 15
    After attempting every fix under the sun, what we discovered was that the client had an "&" in one of the work center names. This was the problem. It took for ever to figure out the problem since they had over 40 work centers!
  • trgnavtrgnav Member Posts: 1
    Thanks God! I found your troubleshooting here.
    Thank you very much for your topic.