Hi!
Problem1
I've keyed in the wrong qty to receive on the PO when doing GRN.
Instead of key in 1 on item A, i keyed in 1 on item B of that PO and posted and did the reclass from loc A to loc B.
How do i reverse back my mistake? Is there anything to do with undo shipment in this case?
Problem 2
The PO issued is 2pcs and GRN done is 2pcs on item A(suppose to post only 1 item)
But the physical item recieve is 1pcs.
A reclass is done for 1pcs from loc A to loc B
What step should i do to solve this mistake.
Pls advise the steps
Thks!
Thks!
0
Comments
2. Just the same as for the first.
(What does GRN mean, anyway? Grin or green?
I've tried to do a undo receipt, but the system prompted me the msg remaining quanity must be 1 in ledger entry 12321. Any idea?
GRN? Not very sure, i think it's goods receive note.
How's the "apply to" being use? apply to the ledger entry that's having problems?
What do you think?
Thks!
As for cost reversal, the point is applying to the ledger entry that has to be sent back. Logically, as the purchase entry is already applied by the relocation, relocation is applied by relocating back, you would apply it to the relocating back entry. That way you would override FIFO costing, and this is important, because by FIFO, it could be possible that you received an Item for a Unit Cost of 25 but you would send back one with 20. By overriding the FIFO, the cost forwarding flow will become a full circle, and thus accidentaly received and sent back items won't change your inventory value.
Thks!