Scrap % field in Production Bom

santoshmkcet
Member Posts: 229
Hi,
While entering a value more than 100, in "Scrap %" field in Production Bom, error message occurs "Maximum permitted value is 100".
Scenario: When the input is 100 kg & output is 20 kg. The "known" scrap is 80 kg obviuosly.
So the percentage of scrap in terms of output is 400 % (80 kg / 20 kg * 100)
But cannot enter the value 400 in "Scrap %".
Advice is required on this matter.
Thanks in advance.
While entering a value more than 100, in "Scrap %" field in Production Bom, error message occurs "Maximum permitted value is 100".
Scenario: When the input is 100 kg & output is 20 kg. The "known" scrap is 80 kg obviuosly.
So the percentage of scrap in terms of output is 400 % (80 kg / 20 kg * 100)
But cannot enter the value 400 in "Scrap %".
Advice is required on this matter.
Thanks in advance.
Thanks & Regards
Santosh
Where Stones can be transformed to Gold
Santosh
Where Stones can be transformed to Gold
0
Comments
-
-
The only advice is, go to the table "Production BOM Line", where in the propeerties the maximum value is set to 100. But when you change this, waht will happen?0
-
When entering a Production BOM you don't really calculate with more than 100% scrap do you? Then you must really be bad at calculating
When you know know your output and your input then you know the scrap quantity and that is what you post in in a consumption-, output- or production journal._____________________
NAV Freelance Consultant0 -
Right from the definition of the scrap factor (see Philip Obal, Glossary of supply chain terminology, e. g.) as "The percentage of raw materials or components included in gross requirements and expected to be lost in the manufacturing process.", it would be right to allow only percentage values between 0 and 100 (since it cannot be more lost than what is available...) - but unfortunately, the planning needs in NAV are calculated with an added percentage of the output (instead of a subtracted percentage referred to the input). This can be seen for example in the function PlanningNeeds in Table 99000829 "Planning Component" (and in several other objects), so in the above example, the "real" scrap factor would be 80 kg from 100 kg, i. e. 80 %, but in order to get NAV calculate the right planning needs, one has to setup a scrap factor of 400 %... - This should of course be corrected in the future.New kits on the blog: https://massivedynamicsblog.wordpress.com0
-
ssingla wrote:Is it a real time scenario or you are testing?
Its real time scenario. We have raw materials in bars of about 10kg
some products are of .5 kg wt and their shape are in such way that only 10 or 12 pcs can be produced
so for producing 0.5 kg of 1 pcs, we have to scrap about 0.5 kg
so about 100% scrap for producing 1 product.
similarly we have products of 0.1 kg wt & about 20 pcs
so to produce 0.1 kg of 1 pcs we have to scrap 0.4 kg
so about 400% scrap....Thanks & Regards
Santosh
Where Stones can be transformed to Gold0 -
Snoopy wrote:The only advice is, go to the table "Production BOM Line", where in the propeerties the maximum value is set to 100. But when you change this, waht will happen?
Thank you snoopy =D>Thanks & Regards
Santosh
Where Stones can be transformed to Gold0 -
noname wrote:When entering a Production BOM you don't really calculate with more than 100% scrap do you? Then you must really be bad at calculating
When you know know your output and your input then you know the scrap quantity and that is what you post in in a consumption-, output- or production journal.
Dear noname,
I know my maths very well, but i think you have not faced these scenarios in your career.
Just look at the scenario that i have explained 2 posts before...Thanks & Regards
Santosh
Where Stones can be transformed to Gold0 -
gerdhuebner wrote:Right from the definition of the scrap factor (see Philip Obal, Glossary of supply chain terminology, e. g.) as "The percentage of raw materials or components included in gross requirements and expected to be lost in the manufacturing process.", it would be right to allow only percentage values between 0 and 100 (since it cannot be more lost than what is available...) - but unfortunately, the planning needs in NAV are calculated with an added percentage of the output (instead of a subtracted percentage referred to the input). This can be seen for example in the function PlanningNeeds in Table 99000829 "Planning Component" (and in several other objects), so in the above example, the "real" scrap factor would be 80 kg from 100 kg, i. e. 80 %, but in order to get NAV calculate the right planning needs, one has to setup a scrap factor of 400 %... - This should of course be corrected in the future.
thank you for understanding.
=D>Thanks & Regards
Santosh
Where Stones can be transformed to Gold0
Categories
- All Categories
- 73 General
- 73 Announcements
- 66.6K Microsoft Dynamics NAV
- 18.7K NAV Three Tier
- 38.4K NAV/Navision Classic Client
- 3.6K Navision Attain
- 2.4K Navision Financials
- 116 Navision DOS
- 851 Navision e-Commerce
- 1K NAV Tips & Tricks
- 772 NAV Dutch speaking only
- 617 NAV Courses, Exams & Certification
- 2K Microsoft Dynamics-Other
- 1.5K Dynamics AX
- 320 Dynamics CRM
- 111 Dynamics GP
- 10 Dynamics SL
- 1.5K Other
- 990 SQL General
- 383 SQL Performance
- 34 SQL Tips & Tricks
- 35 Design Patterns (General & Best Practices)
- 1 Architectural Patterns
- 10 Design Patterns
- 5 Implementation Patterns
- 53 3rd Party Products, Services & Events
- 1.6K General
- 1.1K General Chat
- 1.6K Website
- 83 Testing
- 1.2K Download section
- 23 How Tos section
- 252 Feedback
- 12 NAV TechDays 2013 Sessions
- 13 NAV TechDays 2012 Sessions