Multi Level PBOM

Ah_KitAh_Kit Member Posts: 24
Dear All,

I've a doubt about the multi level PBOM setup.

item Qty
BOM 001 --> A1 1
A2 2
A3 3

BOM 002 --> B1 10
B2 20

BOM 003 --> C1 10
C2 20
C3 30

BOM 100--> BOM 001 1
BOM 002 2

BOM 200 --> BOM 001 2
BOM 003 5

Production A - BOM 100 1
BOM 200 5

For the above scenarion, Navision able to handle the multi level PBOM ?
Anyone can give me some guideline for the above setup ?

Thank you.

Regards
Liau

Comments

  • SogSog Member Posts: 1,023
    NAV can handle that production bom
    BoM 001             |  BoM 002           | BoM003
    type    no   qty    | type    no   qty   | type    no   qty
    item    A1      1   | item    B1     10  | item     C1    10
    item    A2      2   | item    B2     20  | item     C2    20
    item    A3      3   |                    | item     C3    30 
    -----------------------------------------------------------
    BoM 100                      |  BoM 200
    type          no         qty | type           no      qty 
    Prod. Bom   BOM 001       1  | Prod. Bom   BoM001      2
    Prod. Bom   BOM 002       2  | Prod. Bom   BoM003      5  
    ----------------------------------------------------------
    Production A 
    Type         no          qty
    Prod. Bom  BOM 100        1
    Prod. Bom  BOM 200        5
    

    Each part of the code above is a seperate production bom
    NAV can have as well as an item as a production bom in a production bom thus enabling a multilevel production bom
    in the production based on the prod bom production A the material list would be this (i could have made a mathmetical mistake):
    Item qty
    A1 11
    A2 22
    A3 33
    B1 20
    B2 40
    C1 250
    C2 500
    C3 750
    |Pressing F1 is so much faster than opening your browser|
    |To-Increase|
  • AdamRoueAdamRoue Member Posts: 1,283
    Yes it can.

    BOM001 is attached to an item, you set this item in BOM100 to reflect the flow. Think of them as items rather than BOM records, you attach the item to the BOM not the BOM to the BOM. Depending upon the line properties as Production BOM or item this is then treated as a phantom or an individual item with its own production order.
    The art of teaching is clarity and the art of learning is to listen
  • Ah_KitAh_Kit Member Posts: 24
    Dear Adam,

    I follow your guideline to setup multilevel PBOM but encounter the new problem again.

    Due to the PBOM linkage is on the BOM thus the costing can't be calculated, is there any method to calculate?

    In the last stage, when reporting output as FGS Item A, there is no consumption attached with the
    FGS A. Thus unable drill down to the item ledger entries level.

    Example : Production A contain of PBOM 100 and PBOM 200, The linkage is on the BOM order, how to calculate the costing?

    Please help me.

    Thanks you.

    Regards
    Liau
  • AdamRoueAdamRoue Member Posts: 1,283
    Have you set the second level BOM as an item type or a Production BOM type?

    What is your costing method?

    What is the cost of the item specified at the second level?

    If it is an item type did you complete the production order for it?

    In reality there is no difference here to a purchased item, you just need to make it and consume it and use the systme costs, if it is a phantom then you will consume the component parts and get the cost through the consumption in this manner.
    The art of teaching is clarity and the art of learning is to listen